CAN WE FINISH THE WALL TODAY?
The tile cutting set-up ready to go in dry mode - we convert to wet mode outside later.
and the operator is eager to get started ....
The challenge is the right cubicle.
We get some of the tile to the planned top and along side the cubicle.
Sara touches up the Travertine molding ...
prepares the parts with Thinset ......
and builds the cubbie insides while I cut the pieces for her (out in the heat, of course).
a few little hiccups along the way
and over several hours the cubicle takes shape.
We leave the construction site guard on duty as we adjourn to supper.
.......ARE WE HAVING FUN YET?